Chlorine is dosed in the distribution tanks before the trucks are loaded.

Water chlorination against cholera in Tawila

Location and Country: Tawila, North Darfur · Sudan

Responsible organization:Médecins Sans Frontières Italy

Tawila, in North Darfur, hosts people displaced from nearby areas in sites where access to safe water is limited. Cholera spreads mainly through contaminated water and food, and every untreated water point raises the risk of new cases.

The project chlorinates the water of wells and distribution tanks and trucks it to the sites. The teams dose the chlorine, measure residual chlorine at the collection points and record the volumes delivered; alongside distribution, they explain to families how to store water in household containers.

Médecins Sans Frontières states that in 2025 it distributed 407 million litres of chlorinated water in Sudan to contain an epidemic. The goal, progress and updates on this page are demonstration figures, not data reported by the organization.

Declared progress

22,000 cubic metres of chlorinated water distributed of 40,000 planned · 55%
Estimated unit cost€0.80/ cubic metres of chlorinated water distributed
Total expected cost€32,000(planned)

Operational update timeline

Chronological log of field dispatches, itemized expenditures, and delivered units per milestone.

  1. Distribution extended to three new sites

    Three sites opened in January were added to the truck rounds. 6,500 cubic metres of chlorinated water were distributed over the period.

    Units delivered in this phase: 6500 cubic metres of chlorinated water distributed Reported expenditure in this update: €5,200
  2. Storage tanks installed at the collection points

    Six flexible tanks were laid to shorten waits at deliveries. 9,000 cubic metres of chlorinated water were distributed over the period.

    Units delivered in this phase: 9000 cubic metres of chlorinated water distributed Reported expenditure in this update: €7,200
  3. Chlorination started at the first water points

    Chlorination started at four wells and their tanks, with residual chlorine measured at every load. 6,000 cubic metres of chlorinated water were distributed.

    Units delivered in this phase: 6000 cubic metres of chlorinated water distributed Reported expenditure in this update: €4,800