At each collection point residual chlorine is measured before the taps are opened.

Drinking water distribution in Deir al-Balah

Location and Country: Deir al-Balah, Gaza Strip · Palestinian territories

Responsible organization:Médecins Sans Frontières Italy

In the central Gaza Strip the water network and treatment plants work intermittently, and part of the population depends on water delivered by truck. The project supplies collection points in the areas of Deir al-Balah that host displaced families, fitted with ground tanks and shared taps.

The water comes from desalination plants and from wells that are still working. Before each distribution the teams measure residual chlorine in the tanks, and the volumes delivered are recorded point by point. The unit follows the equivalence the organization states: 9 euros cover one week of drinking water for 113 people.

Médecins Sans Frontières states that it provides clean water to 400,000 people every month in Gaza. The goal, progress and updates on this page are demonstration figures, not data reported by the organization.

Declared progress

192,000 people supplied with water for one week of 300,000 planned · 64%
Estimated unit cost€0.08/ people supplied with water for one week
Total expected cost€24,000(planned)

Operational update timeline

Chronological log of field dispatches, itemized expenditures, and delivered units per milestone.

  1. Two collection points added in the western sector

    Two 10,000-litre ground tanks with shared taps were installed. Over the period, the water distributed equals one week of supply for 66,000 people.

    Units delivered in this phase: 66000 people supplied with water for one week Reported expenditure in this update: €5,280
  2. A second daily delivery round introduced

    The trucks now run two rounds a day to the busiest points. The water distributed over the period equals one week of supply for 70,000 people.

    Units delivered in this phase: 70000 people supplied with water for one week Reported expenditure in this update: €5,600
  3. Deliveries started at the first collection points

    Delivery points and times were agreed with the site committees. In the first weeks, the water distributed equals one week of supply for 52,000 people.

    Units delivered in this phase: 52000 people supplied with water for one week Reported expenditure in this update: €4,160